CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan (delivered 13 November 2012)
  • Bi-annual report (delivered 7 May 2013)
  • Mid-term progress report (draft delivered 16 October 2013)
  • Final progress report

Meetings

  • Kick-off meeting, 13 September 2012, Strasbourg (France)
  • Board Teleconference, 19 November 2012
  • SAC meeting, 23 November 2012, Paris (France)
  • PMT meeting, 3 September 2013, Strasbourg (France) (during the Second Technology Forum)
  • SAC meeting, 5 September 2013, Paris (France)
  • Board Teleconference, 8 October 2013
  • First year review, 30 October 2013, Brussels (Belgium)
Added:
>
>
 

Revision 162013-12-13 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan (delivered 13 November 2012)
  • Bi-annual report (delivered 7 May 2013)
  • Mid-term progress report (draft delivered 16 October 2013)
  • Final progress report

Meetings

  • Kick-off meeting, 13 September 2012, Strasbourg (France)
  • Board Teleconference, 19 November 2012
  • SAC meeting, 23 November 2012, Paris (France)
  • PMT meeting, 3 September 2013, Strasbourg (France) (during the Second Technology Forum)
  • SAC meeting, 5 September 2013, Paris (France)
  • Board Teleconference, 8 October 2013
Added:
>
>
  • First year review, 30 October 2013, Brussels (Belgium)
 

Revision 152013-10-27 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan (delivered 13 November 2012)
  • Bi-annual report (delivered 7 May 2013)
Changed:
<
<
  • Mid-term progress report
>
>
  • Mid-term progress report (draft delivered 16 October 2013)
 
  • Final progress report

Meetings

  • Kick-off meeting, 13 September 2012, Strasbourg (France)
  • Board Teleconference, 19 November 2012
  • SAC meeting, 23 November 2012, Paris (France)
  • PMT meeting, 3 September 2013, Strasbourg (France) (during the Second Technology Forum)
  • SAC meeting, 5 September 2013, Paris (France)
  • Board Teleconference, 8 October 2013

Revision 142013-10-07 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan (delivered 13 November 2012)
  • Bi-annual report (delivered 7 May 2013)
  • Mid-term progress report
  • Final progress report

Meetings

Added:
>
>
  • PMT meeting, 3 September 2013, Strasbourg (France) (during the Second Technology Forum)
 
  • SAC meeting, 5 September 2013, Paris (France)
Added:
>
>

Revision 132013-08-23 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan (delivered 13 November 2012)
Changed:
<
<
  • Bi-annual report
>
>
  • Bi-annual report (delivered 7 May 2013)
 
  • Mid-term progress report
  • Final progress report

Meetings

Added:
>
>
  • SAC meeting, 5 September 2013, Paris (France)

Revision 122012-12-19 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan (delivered 13 November 2012)
  • Bi-annual report
  • Mid-term progress report
  • Final progress report

Meetings

Added:
>
>
  • SAC meeting, 23 November 2012, Paris (France)

Revision 112012-11-21 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
Changed:
<
<
  • Project plan
>
>
  • Project plan (delivered 13 November 2012)
 
  • Bi-annual report
  • Mid-term progress report
  • Final progress report

Meetings

Revision 102012-11-16 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan
  • Bi-annual report
  • Mid-term progress report
  • Final progress report

Meetings

Added:
>
>

Revision 92012-10-26 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

Changed:
<
<

WP lead : Françoise Genova, assisted by Laurence Arbousse

>
>

WP lead : Françoise Genova, assisted by Laurence Arbousse

 

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

  • Project web site (delivered 28 September 2012)
  • Project plan
  • Bi-annual report
  • Mid-term progress report
  • Final progress report

Meetings

Revision 82012-09-28 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead : Françoise Genova, assisted by Laurence Arbousse

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site

  • Task 1.3 Project external presence

  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.

Deliverables

Changed:
<
<
  • Project web site
>
>
  • Project web site (delivered 28 September 2012)
 
  • Project plan
  • Bi-annual report
  • Mid-term progress report
  • Final progress report

Meetings

Revision 72012-09-26 - FrancoiseGenova

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

Changed:
<
<

WP lead

>
>

WP lead : Françoise Genova, assisted by Laurence Arbousse

 

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

Changed:
<
<
  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
>
>
  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC.
 
    • Project management tasks include
Changed:
<
<
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
>
>
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions
      • Management of high level project scientific guidance by the Science Advisory Committee.
 
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
Changed:
<
<
    • Overall legal, contractual, financial and administrative management activities include
>
>
    • Overall legal, contractual, financial and administrative management activities
Deleted:
<
<
      • Collection of signatures from all partners in due time
      • Reception and distribution of project funds
      • Production of the contractual reports (D1.3, D1.4, D1.5, D1.6), including the cost statements
      • Obtaining audit certificates by each of the partners if required
      • Compilation of the meetings organised and the reports produced by the project
 
Changed:
<
<
  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project
>
>
  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site
 
Changed:
<
<
  • Task 1.3 Project external presence : This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
>
>
  • Task 1.3 Project external presence
Deleted:
<
<
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings of the CoSADIE
    • Production of dissemination information requested by EC Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.
 
Changed:
<
<
  • Task 1.4 Financial support to associate partners and invited participants : This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.
>
>
  • Task 1.4 Financial support to associate partners and invited participants : The task is delegated to the relevant WP for each meeting.
 

Deliverables

Changed:
<
<
  • D1.1) Project web site
  • D1.2) Project plan
  • D1.3) Bi-annual report
  • D1.4) Mid-term progress report
  • D1.5) Final progress report
>
>
  • Project web site
  • Project plan
  • Bi-annual report
  • Mid-term progress report
  • Final progress report
Added:
>
>

Meetings

Revision 62012-09-07 - LaurenceArbousse

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities include
      • Collection of signatures from all partners in due time
      • Reception and distribution of project funds
      • Production of the contractual reports (D1.3, D1.4, D1.5, D1.6), including the cost statements
      • Obtaining audit certificates by each of the partners if required
      • Compilation of the meetings organised and the reports produced by the project

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project

  • Task 1.3 Project external presence : This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings of the CoSADIE
    • Production of dissemination information requested by EC Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.

  • Task 1.4 Financial support to associate partners and invited participants : This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.

Deliverables

Changed:
<
<
  • D1.1) Project web site: Implementation of the TWiki (or similar) site for internal and external communication on project activities, allowing input and comments from the project participants and the community at large. This site will be continuously nurtured during the project life. [month 1]

  • D1.2) Project plan: Detailed description of the project plan, including the plan for outreach activities (towards all stakeholders) and educational material, the impact metrics and the success indicators which will be monitored during the project. [month 2]

  • D1.3) Bi-annual report: The report briefly summarizes activities and progress made during the first six months of the project. [month 7]
>
>
  • D1.1) Project web site
  • D1.2) Project plan
  • D1.3) Bi-annual report
  • D1.4) Mid-term progress report
  • D1.5) Final progress report
Deleted:
<
<
  • D1.4) Mid-term progress report: This report summarizes activities and progress made during the first half of the project, including on scientific requirement and feedback, on data centre requirement and feedback, on education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]

  • D1.5) Final progress report: The contractual reports will be provided to EC at the end of the project. They will contain all the required elements about the project activities, including outreach activities including all stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]

Revision 52012-09-07 - TWikiAdminUser

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities include
      • Collection of signatures from all partners in due time
      • Reception and distribution of project funds
      • Production of the contractual reports (D1.3, D1.4, D1.5, D1.6), including the cost statements
      • Obtaining audit certificates by each of the partners if required
      • Compilation of the meetings organised and the reports produced by the project

  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project

  • Task 1.3 Project external presence : This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings of the CoSADIE
    • Production of dissemination information requested by EC Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.
Changed:
<
<
  • Task 1.4 Financial support to associate partners and invited participants
>
>
  • Task 1.4 Financial support to associate partners and invited participants : This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.
Deleted:
<
<
This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.
 

Deliverables

Changed:
<
<
  • D1.1) Project web site: Implementation of the TWiki (or similar) site for internal and external communication on
>
>
  • D1.1) Project web site: Implementation of the TWiki (or similar) site for internal and external communication on project activities, allowing input and comments from the project participants and the community at large. This site will be continuously nurtured during the project life. [month 1]
Deleted:
<
<
project activities, allowing input and comments from the project participants and the community at large. This site will be continuously nurtured during the project life. [month 1]
 
Changed:
<
<
  • D1.2) Project plan: Detailed description of the project plan, including the plan for outreach activities (towards all
>
>
  • D1.2) Project plan: Detailed description of the project plan, including the plan for outreach activities (towards all stakeholders) and educational material, the impact metrics and the success indicators which will be monitored during the project. [month 2]
Deleted:
<
<
stakeholders) and educational material, the impact metrics and the success indicators which will be monitored during the project. [month 2]
 
Changed:
<
<
  • D1.3) Bi-annual report: The report briefly summarizes activities and progress made during the first six months of
>
>
  • D1.3) Bi-annual report: The report briefly summarizes activities and progress made during the first six months of the project. [month 7]
Deleted:
<
<
the project. [month 7]
 
Changed:
<
<
  • D1.4) Mid-term progress report: This report summarizes activities and progress made during the first half of
>
>
  • D1.4) Mid-term progress report: This report summarizes activities and progress made during the first half of the project, including on scientific requirement and feedback, on data centre requirement and feedback, on education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]
Deleted:
<
<
the project, including on scientific requirement and feedback, on data centre requirement and feedback, on education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]
 
Changed:
<
<
  • D1.5) Final progress report: The contractual reports will be provided to EC at the end of the project. They
>
>
  • D1.5) Final progress report: The contractual reports will be provided to EC at the end of the project. They will contain all the required elements about the project activities, including outreach activities including all stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]
Deleted:
<
<
will contain all the required elements about the project activities, including outreach activities including all stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]
 

Revision 42012-09-07 - TWikiAdminUser

 
META TOPICPARENT name="WebHome"

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

WP lead

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

Changed:
<
<
  • Task 1.1: Project management This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
>
>
  • Task 1.1 Project management : This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
 
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities include
      • Collection of signatures from all partners in due time
      • Reception and distribution of project funds
      • Production of the contractual reports (D1.3, D1.4, D1.5, D1.6), including the cost statements
      • Obtaining audit certificates by each of the partners if required
      • Compilation of the meetings organised and the reports produced by the project
Changed:
<
<
  • Task 1.2: Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project
  • Task 1.3: Project external presence
This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings
of the CoSADIE
    • Production of dissemination information requested by EC
>
>
  • Task 1.2 Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project

  • Task 1.3 Project external presence : This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings of the CoSADIE
    • Production of dissemination information requested by EC Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.

  • Task 1.4 Financial support to associate partners and invited participants
Deleted:
<
<
Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.
  • Task 1.4: Financial support to associate partners and invited participants
 This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.

Deliverables

  • D1.1) Project web site: Implementation of the TWiki (or similar) site for internal and external communication on
project activities, allowing input and comments from the project participants and the community at large. This site will be continuously nurtured during the project life. [month 1]

  • D1.2) Project plan: Detailed description of the project plan, including the plan for outreach activities (towards all
stakeholders) and educational material, the impact metrics and the success indicators which will be monitored during the project. [month 2]

  • D1.3) Bi-annual report: The report briefly summarizes activities and progress made during the first six months of
the project. [month 7]

  • D1.4) Mid-term progress report: This report summarizes activities and progress made during the first half of
the project, including on scientific requirement and feedback, on data centre requirement and feedback, on education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]

  • D1.5) Final progress report: The contractual reports will be provided to EC at the end of the project. They
will contain all the required elements about the project activities, including outreach activities including all stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]

Revision 32012-09-07 - TWikiAdminUser

 
META TOPICPARENT name="WebHome"
Changed:
<
<

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

>
>

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

WP1 Management (CNRS)

 
Changed:
<
<

WP lead

>
>

WP lead

 
Changed:
<
<

WP Objectives

>
>

WP Objectives

 
  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence
Changed:
<
<

Description of Work

>
>

Description of Work

 
Changed:
<
<
  • Task 1.1: Project management
This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of
>
>
  • Task 1.1: Project management This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities include
Deleted:
<
<
the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The
first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met
and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities include
 
      • Collection of signatures from all partners in due time
      • Reception and distribution of project funds
      • Production of the contractual reports (D1.3, D1.4, D1.5, D1.6), including the cost statements
      • Obtaining audit certificates by each of the partners if required
      • Compilation of the meetings organised and the reports produced by the project
Changed:
<
<
  • Task 1.2: Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is
>
>
  • Task 1.2: Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project
Deleted:
<
<
fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project
 
  • Task 1.3: Project external presence
This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
Added:
>
>
 
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings
of the CoSADIE
Added:
>
>
 
    • Production of dissemination information requested by EC
Changed:
<
<
Dissemination towards the community (scientific users and data centres, VO technology teams, educational
>
>
Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.
Deleted:
<
<
community) is ensured by the relevant Work Packages.
 
  • Task 1.4: Financial support to associate partners and invited participants
Changed:
<
<
This task supports the travel expenses of associate partners and invited participants to attend meetings
>
>
This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.
Deleted:
<
<
organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.
 
Changed:
<
<

Deliverables

>
>

Deliverables

 
  • D1.1) Project web site: Implementation of the TWiki (or similar) site for internal and external communication on
Changed:
<
<
project activities, allowing input and comments from the project participants and the community at large. This site
>
>
project activities, allowing input and comments from the project participants and the community at large. This site will be continuously nurtured during the project life. [month 1]
Deleted:
<
<
will be continuously nurtured during the project life. [month 1]
 
  • D1.2) Project plan: Detailed description of the project plan, including the plan for outreach activities (towards all
Changed:
<
<
stakeholders) and educational material, the impact metrics and the success indicators which will be monitored
>
>
stakeholders) and educational material, the impact metrics and the success indicators which will be monitored during the project. [month 2]
Deleted:
<
<
during the project. [month 2]
 
  • D1.3) Bi-annual report: The report briefly summarizes activities and progress made during the first six months of
the project. [month 7]

  • D1.4) Mid-term progress report: This report summarizes activities and progress made during the first half of
Changed:
<
<
the project, including on scientific requirement and feedback, on data centre requirement and feedback, on
>
>
the project, including on scientific requirement and feedback, on data centre requirement and feedback, on education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]
Deleted:
<
<
education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]
 
  • D1.5) Final progress report: The contractual reports will be provided to EC at the end of the project. They
Changed:
<
<
will contain all the required elements about the project activities, including outreach activities including all
>
>
will contain all the required elements about the project activities, including outreach activities including all stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]
Deleted:
<
<
stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]
 

Revision 22012-09-06 - LaurenceArbousse

 
META TOPICPARENT name="WebHome"
Changed:
<
<
TBC
>
>

CoSADIE - Collaborative Sustainable Astronomical Data Infrastructure for Europe

Added:
>
>

WP1 Management (CNRS)

WP lead

WP Objectives

  • To oversee the project on behalf of all the partners
  • To co-ordinate the technical activities of the partners
  • To co-ordinate financial and administrative matters
  • To ensure communication within the project
  • To deliver the project external presence

Description of Work

  • Task 1.1: Project management
This task includes all activities necessary to manage and control the project, the management activities linked to the contractual obligations and communication with EC. The project bodies are described in Section B2 of the Description of Work.
    • Project management tasks include
      • Preparation, organisation of Board and Project Management Team meetings, implementation and monitoring of
the decisions (M1, M4, M10, M17, M22, M28)
      • Management of high level project scientific guidance by the Science Advisory Committee (M3, M14, M20). The
first meeting of the Science Advisory Committee will in particular be used to gather high level guidance on the foreseen project activities and will be used in the establishment of the detailed project plan (D1.2)
      • Monitoring of project activities in collaboration with the WP leads, including checking that milestones are met
and deliverables are properly produced, checks of eventual deviations to the project plan, and transmission of problems to the Board if required
    • Overall legal, contractual, financial and administrative management activities include
      • Collection of signatures from all partners in due time
      • Reception and distribution of project funds
      • Production of the contractual reports (D1.3, D1.4, D1.5, D1.6), including the cost statements
      • Obtaining audit certificates by each of the partners if required
      • Compilation of the meetings organised and the reports produced by the project
  • Task 1.2: Communication within the project is in particular ensured through the TWiki Web site (D1.1), which is
fed on a collaborative model by the project management team, work package leads and project participants. A small fraction of the TWiki site may be set with controlled access for dissemination of information reserved to the project if needed, but most of the site is in public access, allowing anyone to get full information on the project activities and details on the meetings organised by the project
  • Task 1.3: Project external presence
This task includes, in addition to the implementation and maintenance of the project TWiki site D1.1,
    • Presence at meetings organised by EC or in other national and international meetings to advertise the findings
of the CoSADIE
    • Production of dissemination information requested by EC
Dissemination towards the community (scientific users and data centres, VO technology teams, educational community) is ensured by the relevant Work Packages.
  • Task 1.4: Financial support to associate partners and invited participants
This task supports the travel expenses of associate partners and invited participants to attend meetings organised by CoSADIE. It is distributed among the partners and among the Work Packages: the partner in charge of organising a meeting will get the corresponding funds in the frame of the relevant Work Package and will take care of the travel support. The task is thus delegated to the relevant WP for each meeting.

Deliverables

  • D1.1) Project web site: Implementation of the TWiki (or similar) site for internal and external communication on
project activities, allowing input and comments from the project participants and the community at large. This site will be continuously nurtured during the project life. [month 1]

  • D1.2) Project plan: Detailed description of the project plan, including the plan for outreach activities (towards all
stakeholders) and educational material, the impact metrics and the success indicators which will be monitored during the project. [month 2]

  • D1.3) Bi-annual report: The report briefly summarizes activities and progress made during the first six months of
the project. [month 7]

  • D1.4) Mid-term progress report: This report summarizes activities and progress made during the first half of
the project, including on scientific requirement and feedback, on data centre requirement and feedback, on education activities and their sustainability, and on outreach activities, uncluding outreach towards the general public interested in astronomy. It monitors and updates the impact metrics and the success indicators. It summarizes the work programme for the next year. It includes a financial report and all other elements required in a contractual report. [month 12]

  • D1.5) Final progress report: The contractual reports will be provided to EC at the end of the project. They
will contain all the required elements about the project activities, including outreach activities including all stakeholders, financial reports, societal impact report and plan for dissemination of knowledge towards all stakeholders. [month 24]

Revision 12012-08-08 - TWikiAdminUser

 
META TOPICPARENT name="WebHome"
TBC
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright &© 1999-2017 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback
Note: Please contribute updates to this topic on TWiki.org at TWiki:TWiki.WP1Management.